Rather fast that is when our house wasn't taken over by plumbing supplies!
We hit a few speed bumps along the road. Some of our pipes were lead and had to be replaced completely. Luckily, they were only evacuation pipes so there was no risk to our family.
The first thing that got accomplished was my half wall! I have been dreaming about this wall since the day we moved in!
Finally, the hideous water heater was covered!
Then, our beautiful tile started going on the wall! What a difference the tile made!
And then after a long weekend, the tiles were done and it seemed like the bathroom was finished!
But today, finally, the tile was finished and grouted; the shower bar installed, and our beautiful double sink was set in place. And I'm finally at peace with the bathroom renovation.
Paint the walls
Install lighting and mirror
Install shower bar/shower curtain
While it doesn't sound like a lot, after getting all of the big things done the details seem to be daunting. Hopefully soon we can claim victory over the bathroom renovation.